Feasibility Study On Construction Of Charging Pile In H Large Parking

Posted on:2017-02-28Degree:MasterType:Thesis
Country:ChinaCandidate:W PengFull Text:PDF
GTID:2382330596962061Subject:Engineering
Abstract/Summary:PDF Full Text Request
On the basis of the charging piles construction project of H large parking lot in Zhujiang,Guangzhou,through finishing the collection of new energy vehicles and the relevant policies and regulations of the basic facilities,this paper demonstrated the technical requirements of the project construction,analyzed the practical significance of the project combined with the present situation of the charging infrastructure construction of China and Guangdong province,Guangzhou.Then the necessity of this construction project was proved.Based on the analysis on the necessity of project construction,the charging pile project site selection,construction conditions and technical proposal was specifically analyzed combined with field condition of Zhujiang new urban district.According to the strategic planning of new energy vehicles in The Thirteenth Five-Year Plan the popularization target of new energy vehicles and The population development planning in Guangzhou,Guangdong,the car ownership and the influence factor of charging demand in zhujiang region during the the Thirteenth Five-Year Plan was analyzed,referring to the charging demand of Tesla super charging station in same region.The charging demand of new energy vehicles in the next five years was analyzed.The net present value method was used to evaluate the construction project,the optimal case which gave maximum net present value and its economic indicators was presented.Finally,the mainly risk in the construction was analyzed by using FMEA method,including funding risks,policy risks,construction risks,external risks and technical risk.the failure form and corresponding influence,main factors and existing control measures was proposed.Then the mainly risky failure form was pointed out and improvement measures was presented combined with the risk priority number.The risks after modification was evaluated again,which provided important reference to the charging pile construction project of H large paring lot and the risk aversion.
Keywords/Search Tags:electric cars, charging infrastructure, charging pile, net present value, FMEA
PDF Full Text Request
Related items