Font Size: a A A

Study On The Cost Control Of The Left Bank Thermal Insulation Construction Project Of Huashan Country Garden

Posted on:2019-07-18Degree:MasterType:Thesis
Country:ChinaCandidate:Z H TanFull Text:PDF
GTID:2392330572463644Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years,cost control has become the focus of enterprises.In enterprise project construction project,the position of project cost control is self-evident.Enterprises can effectively control the project cost,the scale of economic benefits of enterprises will immediately appear.This also causes the enterprise to pay more and more attention to cost control.This article through the analysis of exterior wall thermal insulation project huashan country garden,the huashan country garden of exterior wall thermal insulation project material purchasing and storage and management,the storage and management of the insulation board,project construction management personnel salary,project construction machinery management and use of analysis of huashan country garden of the project cost control in depth analysis of exterior wall thermal insulation the huashan country garden of the main problems existing in the cost control in the project.The main problems are as follows: the difference between the expected cost of project construction before project implementation and the actual cost after construction;In the whole process of implementation of external wall thermal insulation project of huashan country garden,there appeared the lack of responsibilities and serious loopholes in the management of project personnel.In the external wall thermal insulation project of huashan country garden,problems occurred in material procurement,material use and storage management.The essential reasons of these problems were further studied to find the most effective method to improve the cost control in the external wall insulation board project of huashan country garden.This paper analyzes the cost control problems in the external wall insulation board project of huashan country garden,finds out the causes of the failure of cost control,and looks for solutions.At the same time,the cost accounting in the left bank insulation project of huashan country garden is analyzed,and the cost control problems in the left bank insulation project of huashan country garden are summarized.At the same time,countermeasures and Suggestions for cost control in external wall insulation project of huashan country garden were put forward.In the construction of the project,the quality of the project and the safety of the construction personnel should be guaranteed,and the enterprise should try its best to reduce the construction cost,improve the profit of the enterprise,and enhance the core competitiveness of the enterprise.
Keywords/Search Tags:cost control, huashan country garden, economic benefits
PDF Full Text Request
Related items