Study On Risk Assessment System Of Thermal Power Plant Construction Project In EPC Mode

Posted on:2020-08-18Degree:MasterType:Thesis
Country:ChinaCandidate:L J LiuFull Text:PDF
GTID:2392330590959576Subject:Project management
Abstract/Summary:PDF Full Text Request
Over the past decade,China's ecological and environmental protection problems have become more and more serious.Greenhouse effect,haze,carbon emissions and other issues affect people's daily life and production.The government has begun to pay close attention to and make great effor,ts to tackle climate problems.In view of coal-fired generating units,strict environmental protection emission standards have been formulated,forcing enterprises to carry out energy-saving and emission reduction activities in order to survive.The large investment in infrastructure construction,long payback period and large consumption of non-renewable energy in thermal power plants have greatly reduced their profit margins.Therefore,this paper focuses on the risk management of thermal power plant infrastructure projects under the Energy Performance Contracting model(EPC model)in order to establish a scientific and reasonable risk assessment and control model,which will bring some investment inspiration to investors and contractors.The starting point of this paper is to study the investment risk of construction projects from the perspective of project owners or investors through the construction practice of thermal power plants under EPC mode.The premise of this paper is the knowledge of risk assessment and management in construction project.At the same time,drawing lessons from EPC contracting mode itself and the characteristics of each stage of thermal power plant construction,the risk list of project under general contracting mode is obtained.The importance and seriousness of various factors influencing the risk are evaluated comprehensively,and the risk management in the process of project construction is evaluated.Necessity.At the same time,combined with the different factors affecting the risk,we use tools to make statistics and establish models,so as to get the risk control list in the process of general thermal power plant construction projects,and provide reasonable mitigation,transfer,evasion and other different coping strategies.Then,combined with the engineering practice under EPC mode of large thermal power plant,the validity of the model is tested,and the risk management strategy of the general contracting project is formulated for the thermal power plant infrastructure project itself,which provides the investment reference for the owners or investors.Through the analysis of risk management,project management and fuzzy mathematics and other project risk management,this paper summarizes the method of quantitative analysis of the whole process of project risk,analyses the characteristics of project risk management,evaluates the risk factors of project under EPC mode,establishes the fuzzy evaluation model of project risk under EPC mode,and probes into the project wind in the process of construction of EPC mode.The problems existing in risk monitoring are put forward and corresponding suggestions and countermeasures are put forward.According to the content and type of risk quantification,this paper studies the identification and evaluation of risk factors in EPC management project.
Keywords/Search Tags:EPC model, thermal power station, risk evaluation system
PDF Full Text Request
Related items