Document Management In General Contract Management Of Building Engineering Design

Posted on:2019-11-29Degree:MasterType:Thesis
Country:ChinaCandidate:Q LongFull Text:PDF
GTID:2392330590978790Subject:Project management
Abstract/Summary:PDF Full Text Request
Architectural engineering design is a closely interrelated work of various majors,involving subdivisions of architecture,structure,electromechanical,curtain wall,interior design,landscape,identification,foundation pit,civil air defense,intelligence,lighting,BIM,gas and green building.General design contracting service is one of the common patterns of design management,which means that under the authorization of party a,the general design contracting company subcontracts the project design work to multiple single design units.In the process of sub-contracting the design,the design contractor integrates and controls all kinds of design service suppliers in a one-stop service mode,namely,general responsibility,management and coordination.The document management in the design contract management is an important link in the engineering management.The comprehensiveness,effectiveness,timeliness and standardization of document management play an important role and significance for all participants in the project and the project itself.This paper first introduces the four main types of the design general contracting mode,and from the design general contracting connotation,characteristics,difficulties and management mode to start,comparative analysis of the characteristics,advantages and disadvantages of the four main management mode and the scope of application,summarizes the different large projects should be taken for the general contracting mode.Then it introduces the main contents of the general package document management and elaborates on the classification and related contents of the documents in the management of the design headquarters,studies the archiving and circulation of the document management,and summarizes the difficulties and key contents of the general package document management.This paper introduces the document management mode of the actual engineering design general contract project through a project design general contract file management case in shenzhen,summarizes the advantages and problems of the project in the process of document management,and further provides case reference basis for the document management research of the design general contract management.,through the study of this paper expounds the file management in the total package design model,the important role of the rational utilization of resources,improve the work efficiency,rationality and economy of engineering construction,design decisions and results provide trace source and archives,and summarizes a set of mature and efficient design total package file management system,provides reference for other similar projects.
Keywords/Search Tags:the Design General Contracting, the Document Management, the File Management, the Construction Engineering, the Architectural Design Management
PDF Full Text Request
Related items