Font Size: a A A

Design And Implementation Of Power Company Engineering Process Management System

Posted on:2020-07-10Degree:MasterType:Thesis
Country:ChinaCandidate:S Y XieFull Text:PDF
GTID:2392330602467997Subject:Engineering
Abstract/Summary:PDF Full Text Request
The whole process management system of the power company is to ensure the smooth implementation of related projects through the whole process management and records of the engineering projects implemented by the company.This thesis is based on the specific needs of the power company to study the whole process management system of the power company’s engineering.The design and implementation of the system have introduced the five functions of project management,early stage management,implementation management,completion management,cost management and system management functions implemented in detail.Based on the actual situation of power company engineering project management,combined with information technology,this thesis studies the method of using information technology to solve engineering project management problems.Management of implementation,cost,etc.is a complex process,and the implementation of an engineering project itself requires a lot of time,so it is necessary to improve the management level of the engineering project.The research goal of this thesis is to achieve the power company engineering.The information management of the whole process of the project is of great value to the power company.The research in this thesis can greatly help to improve the management level of the power company.Before completing the development of the entire process management system of the power company’s engineering,a full investigation has been carried out and the ASP.NET to be used in the development of this system has been determined Technology,the main tasks completed in this article are as follows: First,the specific requirements of the system are determined according to the actual business process of the project management of the power company.The functional requirements of the system include 6 parts,which basically cover the entire process of project management.In addition,the non-functional requirements analysis of the system was completed.The second was to complete the overall design of the system.Based on the B / S architecture selected earlier,the overall architecture of the system was designed in a layered mode,and the network topology diagram of the system was performed.Design,and finally completed the database design according to the underlying data model of the system;the third is the detailed design and implementation of the system,combined with the requirements analysis using sequence diagrams to the detailed design of the six major functional modules,adopted in the Visual Studio environment C # language implements the system.The fourth is to test the system during the implementation process,mainly to test the implementation of each function of the system to ensure that each function runs correctly.After the system is implemented,the system is tested in general and combined with the operating environment.Tested for performance and security.The realization of the power company’s whole process management system is of great significance to the power company,which not only improves the efficiency and standardization of the power company’s project management,but also is an important part of the power company’s realization of information construction.In general,it will also improve the overall level of the power company.
Keywords/Search Tags:Engineering project, B/S architecture, ASP.NET, Project management, Cost management
PDF Full Text Request
Related items