Stakeholder Communication And Coordination Management Of Zhangzhou Ancient City's Protection Project At Pre-Construction Stage

Posted on:2018-07-13Degree:MasterType:Thesis
Country:ChinaCandidate:Z Y WangFull Text:PDF
GTID:2405330518983070Subject:Project management
Abstract/Summary:PDF Full Text Request
Ancient city's protection development may lose the original feeling at pre-engineering stage,due to the great uncertainty of project output,contradictions and different interests pursued by all participants.This dissertation aims to study on how to communicate and coordinate effectively at the project early stage of ancient city protection and development,to achieve the requirement of "ancient city construction,restoration as old one,organic update" for society and the government.It is hoped that this dissertation can provide related experience and referential method for the ancient city project development.Case analytic method is used in this dissertation.The problems of Zhangzhou antient city construction was analyzed and summarized to conclude an effective control mechanism.Research is mainly based on the features of construction management at the project early stages.It's then combined with the development and current theories of communication and coordination management.The problems of unreasonable organization structure,lack of feedback,chaotic of internal,external coordination channel and too long path of coordination have been found out.The dissertation then focuses on optimizing the management to tackle these problems and validating the optimized results.Research results indicate that,firstly,communication management plan ought to be based on positioning and identifying project participant;secondly,in view of the communication problems existing in the project construction,the project organization structure should be adjusted,the communication channels should be optimized,the communication process should be shortened,and all kinds of countermeasures should be carried out,so as to adapt to coordination management of the ancient city protection development at pre-engineering stage,to improve the working effectiveness and enhance coordination efficiency.Finally,the performance evaluation of coordination management and method have to be in place to ensure the quality of coordination,and to help its improvement.
Keywords/Search Tags:Ancient city's protection, Stakeholder management, Communication and Coordination
PDF Full Text Request
Related items