Font Size: a A A

Research On Purchasing Management Of Laboratory Construction Project In HH College

Posted on:2018-05-14Degree:MasterType:Thesis
Country:ChinaCandidate:Y K ShenFull Text:PDF
GTID:2417330596969291Subject:Project management
Abstract/Summary:PDF Full Text Request
Purchasing management is the basic guarantee for the normal operation of the school's daily teaching and scientific research.It has become an important aspect of the scientific development of schools.The concept of modern procurement management has undergone tremendous changes,not just limited to the reduction of procurement costs.The mode of running higher vocational colleges is developing towards the direction of rational structure,advanced management methods and clear investment direction.Purchasing management is a foundation to ensure the daily operation of colleges and universities,through the optimization of the procurement process,improve project procurement management level,strengthening procurement control,strengthen purchasing management,enrich the procurement method,to improve teaching quality of equipment procurement,reduce procurement costs,improve the private higher school's educational quality has become an important way to reduce the running cost.This paper takes private vocational colleges as the research object,and aims to improve the quality of school management with the level of project procurement management.The research on project procurement management based on home and abroad,comb ined with the theory of project procurement management,analyzes the causes of the existence of HH college laboratory construction project procurement management problems and the use of project procurement management technology research try to change the mode of procurement of the defects of the existing HH college,and puts forward the safeguard measures from three the system,infrastructure,human resources,on the one hand,to provide the reference for the procurement management of HH college laboratory construction promotion,on the other hand,the improvement for other higher vocational colleges provide some reference to the procurement process..HH Institute laboratory construction project procurement management of the main factors,including the scientific process of project procurement,demonstration of the establishment of expert groups and procurement,executive personnel quality,supplier selection.The establishment of quality control and dynamic specification of project procurement process and supplier base is more important factors affecting the laboratory construction project procurement,the procurement of good staff occupation ability can effectively reduce inventory,reduce the backlog of funds,improve the efficiency of purchasing.Further study of project procurement management in higher vocational colleges can promote the establishment of corresponding security measures,better use of funds and improve the quality of school running.
Keywords/Search Tags:higher vocational colleges, laboratory construction, project procurement management
PDF Full Text Request
Related items