Font Size: a A A

Project Management Research And Design Planning Of "Film And Game Linkage" Based On The Whole Life Cycle

Posted on:2019-02-07Degree:MasterType:Thesis
Country:ChinaCandidate:D S MaFull Text:PDF
GTID:2429330545459243Subject:Art and design
Abstract/Summary:PDF Full Text Request
This paper from the perspective of whole life cycle of the shadow swim linkage design projects of the current management mode and characteristics of combining shadow swim linkage to the characters of project management stage,and corresponds to the industry practice,highlighted by using the theory of whole life cycle management shadow swim linkage advantage of the project,build based on process,control,cost and quality of shadow linkage in whole life cycle of project management system,to lay the theoretical foundation for further optimization of practice.Analyses the international well-known enterprise and shadow swam linkage projects and large enterprises in China shadow project cutting-edge management pattern,frontier management experience for reference,summing up many management mode and method to our enlightenment.On this basis,the linkage for shadow project whole life cycle management optimization design,the project stage,development stage and acceptance stage,late stage management optimization scheme is put forward,put forward the suitable for enterprise's shadow swim linkage projects differentiation management methods.Combed the domestic and foreign relevant theory researching and practice experience,analysis of the force of nanjing company shadowlinkage project management present situation,summarizes the four aspects of problems,namely: the project team structure is not reasonable cause poor co-ordination,uneven distribution of resources affect project development synchronization does not constitute a system,process management,project supervision is not yet in place,etc.Aiming at these problems,puts forward the nanjing force shadow swim linkage of whole life cycle of project management scheme design target and principle,analyzes the scheme design should consider the internal and external factors,from the enterprise team structure,responsibility and balance of the yield rate,resource allocation,the whole process of life cycle management for fine tuning.Finally,the paper puts forward the relevant guarantee measures for the implementation of the whole life cycle management scheme of nanjing yuanli shadow tourism linkage project.And then explores the evaluation after the weak link in whole life cycle,through the shadow to swim after the difference of the project management and the evaluation system to build,better advantage of the maximum utility of resources integration,and realize the shadow linkage projects the whole process closed loop control.Shadow finally,the force to nanjing animation enterprises analyze a linkage project as an example,the whole life cycle theory applied to real projects,provide decision-making reference for improving the efficiency of management and comprehensive benefit.Through the study of this paper,the theoretical and practical value of the whole life cycle theory is verified,and the application of the whole life cycle theory to the management of film and game linkage project can effectively improve the management efficiency and achievement benefits.Shadow swim linkage project this article divided into basis(prospective)researching and explore and subsequent application development to explore,with the development of cross subject,should be in the subsequent exploration and practice,strengthening the independent studio create a project management mode and method of exploration,perfect enterprise management system.Linkage projects at the same time,should strengthen the shadow swim after evaluation,expanding the scope of the shadow after swim linkage project evaluation,evaluate the results after using guide new project project decision-making,improve the shadow linkage management process,improve overall and global benefits.
Keywords/Search Tags:whole life cycle, project-management of film and game linkage, scheme design, post-evaluation
PDF Full Text Request
Related items