Font Size: a A A

A Study Of Problems And Solutions Of Suihua Infrastructure Construction About Implement The PPP Model

Posted on:2019-08-09Degree:MasterType:Thesis
Country:ChinaCandidate:X LiuFull Text:PDF
GTID:2429330566498016Subject:Public administration
Abstract/Summary:PDF Full Text Request
PPP is a a kind of government and social capital cooperation model which is vigorously promoted in China.The application of this model is based on the goal of reducing local financial pressure and promoting infrastructure.This paper firstly introduce the development status of PPP.The background and significance of PPP are expounded by introducing the importance of infrastructure.Through the extensive literature reading analysis as the theoretical support of PPP.Secondly this paper introduces the theory of PPP.Introduces the different concepts of PPP and describes several modes of PPP,like BOT and BT and BOO and BOOT and introduce their concepts and characteristics.Sketch the process of PPP operation from project identification preparation and transfer.To clarify the scope of PPP use,explain the infrastructure field of our country PPP application,and introduce the characteristics of basic infrastructure and investment and financing in infrastructure.In terms of PPP risk,this paper mainly describes the risk market and operation risk political risk and legal risk.And by introducing some successful and failed cases at home and abroad,summarizes the reasons for failure and the key to success,as the reference of Suihua's PPP.At the end of the paper,clarify the present situation and existing problems of the PPP in Suihua and put forward corresponding strategy and advice.Based on the analysis of present condition of Suihua,sums up the problems of Suihua,put forward countermeasure,the countermeasure can draw lessons from the domestic and foreign has implementation of PPP project,and to consider Suihua local conditions.Put forward rationalization proposal as the government how to regulate the operation and establish economic management and coordination agency third-party regulators and introduce PPP talents and promote the PPP pre-project and evaluation expert and strengthened government credit and increase social capital to participate in the enthusiasm.
Keywords/Search Tags:infrastructure, PPP, government, social capital
PDF Full Text Request
Related items