Font Size: a A A

Research On Improving Product Development Quality Management Of A Company Based On APQP

Posted on:2019-03-12Degree:MasterType:Thesis
Country:ChinaCandidate:B HeFull Text:PDF
GTID:2429330596462714Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years,the state has continued to increase the policy support for new energy vehicles.According to the data of the National Statistics Bureau,716 thousand new energy vehicles were produced in 2017,up 51% from the same period,indicating that the market of new energy vehicles in China is extremely strong.The auto parts industry has also prospered,and a large number of foreign auto parts enterprises have entered the country.The competition inside the auto parts industry is becoming increasingly fierce,in which the battery management system,as one of the core components of the new energy vehicle,takes up the market in a large number of competitors.This needs to provide the products that meet the requirements of the customers.To achieve this goal,not only has the world's advanced development technology but also a reasonable development need to be achieved.Effective quality planning to control the development process.The advanced quality planning of products has been popularized in the auto parts industry.It uses structured methods to ensure that products are satisfied with the steps required by customers,and ensures that every step is completed on time.A company is a domestic venture enterprise.In the project of battery management system developed by A company,the product development is carried out with the development process of general electronic products.Through the application of the pre quality planning in the management system development project of A company,this paper expounds how A company gets rid of the traditional electronic product development concept and introduces the management tool in IATF16949 to carry on the quality planning for the development project of the battery management system.First,aiming at the topic,the concept of project quality management and quality planning is put forward.Secondly,the general situation of A company is introduced,and the characteristics and problems of A battery management system development project are analyzed.Then,the actual operation process of the A battery management system development project is analyzed through the advance quality planning.Finally,the effect and deficiency of the pre quality planning in the A battery management system development project are summarized,and the prospect of the application of the pre quality planning in the development project of the battery management system is also prospected.For the battery management system development project of A company,the biggest particularity lies in the different requirements of the traditional electronic product development process and the automotive electronic product development process.Through the study of this paper,the effective application of the pre quality planning can make the operation of the battery management system more applicable to the technical development requirements of the domestic new energy vehicles,and minimize the problems caused by the differences in the design and development process,make the product reach the customer's requirements and improve the customer's product.Satisfaction.
Keywords/Search Tags:Battery management system, Advanced Product Quality Planning, quality cost
PDF Full Text Request
Related items