Font Size: a A A

Optimization Research On Facilities Arrangement Of T Company Plant

Posted on:2020-03-07Degree:MasterType:Thesis
Country:ChinaCandidate:Z F YangFull Text:PDF
GTID:2439330623965214Subject:Industrial engineering
Abstract/Summary:PDF Full Text Request
This paper takes T Co.,Ltd.as the research object,through the system layout design and material handling system design,improves the problems existing in the company's work space design,and proposes an improved plan that can effectively improve the production efficiency of the enterprise.This paper consists of six parts: the first part,from the research background,significance,purpose,and domestic and foreign research objects,the second part,the related theory of facility planning is discussed,especially the system layout design and The theoretical part of the material handling system design provides the theoretical basis for the improvement of the workshop layout.The third part records the current situation of the company's factory area through practice research.After statistical analysis,it reveals the current design shortage of the production workshop layout of the enterprise.The fourth part quantifies the flow of goods and non-material flows occurring in the enterprise,and gives three sets of feasible design schemes.The fifth part uses the traditional analytic hierarchy process and the improved analytic hierarchy process to evaluate the scheme.The comparison and synthesis of the two methods determine the final plan;the sixth part summarizes and evaluates the whole research process,explaining the significance of the research and the various benefits that may be brought to the enterprise,and presenting the article at the end of the article.The lack of research.
Keywords/Search Tags:System layout design, Material handling system design, Analytic hierarchy proces
PDF Full Text Request
Related items