Engineering cost consultation refers to the entrustment of the entrusting party to use the knowledge and technology of engineering cost management to manage the cost of construction projects at different stages.According to the relevant national policies and laws,as well as the pricing requirements of the relevant construction departments,the management stages in the process of project construction,including project decision-making,project design,pre-construction bidding and tendering,project construction stage,engineering At the completion stage of the project,the cost of each of the above stages should be compiled in the form of a document,showing the cost of the construction project in different stages in detail and objectively,so as to better control the investment risk of the construction project and reduce the previous budget error.Really realize the effective control of construction project cost.This article starts from the specific development and analyzes the cost of each stage of the construction project in detail,including pre-decision of the construction project,design and design of the construction project,project bidding,project bidding,project construction and completion,etc.At the same time,this article explores the project cost from various aspects.Among them,weaving and auditing investment are the main work of the cost consulting service in the decision-making stage of the project;the main work of the project cost consulting in the design stage of the project is more than the decision-making stage The choice of program.This article takes the construction project of a residential area as an analysis case,and adheres to the principles of science,fairness and justice,and conducts a very detailed analysis of the problems that exist in the entire cost of the project.Through research and analysis,it is clear that the project cost consultation can be fully effective,and the organization of the construction project,the communication of the entire process,and the safeguard measures for the project construction should be unified;the specific project of the project cost consultation service should be implemented.Responsible system,selected business personnel with outstanding ability to form a working group,and experienced engineering cost consulting technical backbone as the responsible person.At the company level,in order to ensure the smooth development of construction project consulting services,a leadership group is established when necessary.The leadership group consists of engineering cost consulting and management leaders,technical backbone,etc.The responsibility of the leadership group lies with the construction unit on the various aspects of the construction project process.Carry out detailed communication on the items to ensure the smooth progress of the construction cost consulting service of the entire construction project and improve the quality of the consulting service. |