Research On Risk Management Of Rugao New Energy Vehicle S Project In Operation Stage

Posted on:2021-09-20Degree:MasterType:Thesis
Country:ChinaCandidate:W YangFull Text:PDF
GTID:2492306128464974Subject:Project management
Abstract/Summary:PDF Full Text Request
New energy vehicle refers to the use of new clean fuel as the power source,which is different from the use of traditional energy.It has the advantages of relieving energy pressure and reducing environmental pollution.It is an effective carrier to adhere to sustainable development.There is no doubt that new energy vehicles are the future development direction of global vehicles.Many countries have taken various measures to vigorously support the development of new energy vehicles.Rugao new energy vehicle S project emerges as the times require under this background.Due to the large construction investment and long operation cycle of s project,it is inevitable that there are many risk factors.Therefore,it is very meaningful to carry out risk management and control in the construction and operation process of the project.This paper analyzes and summarizes the risk management of s project from the perspective of operation.Through expert interviews,the risk identification of new energy vehicle s project is carried out,and four types of first-class risk factors,namely policy risk,economic risk,social risk and technical risk,are summarized.Combined with a large number of historical documents,this paper summarizes 12 secondary risk factors.The risk factor evaluation index system is constructed,and the risk analysis matrix and analytic hierarchy process are used to deal with the identified risks in a hierarchical manner,and the specific values of various risks are calculated.Among them,economic risk has the largest weight and is the most important factor in the operation risk of new energy vehicles,followed by technological risk and policy risk.According to the above conclusion,from the enterprise level and the government level,formulate corresponding risk response measures,effectively reduce the project operation risk,improve the efficiency of project management,so as to improve the success rate and investment efficiency of the whole project,and provide effective reference for promoting the development of new energy vehicles.
Keywords/Search Tags:New energy vehicle project, Risk management, Operational risk, Analytic hierarchy process
PDF Full Text Request
Related items