Research On Quality Management Of Tieben Expressway Construction Project

Posted on:2022-06-08Degree:MasterType:Thesis
Country:ChinaCandidate:B SangFull Text:PDF
GTID:2492306317490694Subject:Master of Engineering Management (MEM)
Abstract/Summary:PDF Full Text Request
Reform and opening up,a hundred flowers bloom.In particular,the country’s construction is advancing by leaps and bounds,and large,medium and small highways are crisscrossed all over the country.In the process of construction,in order to improve people’s livelihood and en sure the safety of people’s lives and property,the quality of the project is particularly important.In order to meet the requirements of the quality specification and avoid bringing hidden dangers to the future,the relevant units of the project construc tion should carry out a series of management measures to ensure the quality of the project.As the link connecting the city,the expressway has an important value transmission.The quality control of its construction process plays an immeasurable role,and this link has become the key to the success or failure of the project management.On the study of the iron our highway construction quality management,has carried on the on-the-spot investigation project site,refer to the project approval procedures and related construction standards,a lot of reading some of the highway construction quality management,analysis the modern engineering construction quality management problems,facing the conclusion,the project adopted the quality plan,quality control and quality assurance of the three modules,three big module is responsible for ensuring that the engineering quality,be short of one cannot.Through the five quality influencing factors of human,material,environment,law and machine,the engineering design plan,organization system plan and implementation plan of quality are formulated,and the perfect quality plan has a normative and guiding role in the quality control of construction.And then through the analytic hierarchy process(AHP),the control chart method and means of PDCA circulation method,grey evaluation method is applied to the project as an example,using the scientific method to suit the remedy to the case,and this will be a few big before landing in construction quality control means,construction and after construction,quality control,respectively,to make project quality always is manageable,do practice to solve the problem of the quality control of the project.According to the project planning and control,to find may exist in the process of project construction quality problems,at last,through project stakeholders to influence the quality of the project itself,supervision team,information technology,engineering quality assurance audit,organization,system engineering,through this a few big quality assurance measures,make the project to achieve the quality goals.
Keywords/Search Tags:engineering project, quality plan, quality control, quality assurance
PDF Full Text Request
Related items