With the continuous development of Songyuan and progress,it has gradually become the focus of the core area of the city residential docking,with the living level of residents in Songyuan city continue to improve,for the quality of life also increased,at the same time,the power supply reliability and stability requirements are increasing gradually.The design of the project of the Changling three 66 k V transmission and transformation project is set up in this context.First of all,the background and significance of the design of 66 k V intelligent transmission and transformation project in Changling three regiment are expounded,and the theoretical basis for its design and research as well as the main contents of the article are clarified.Based on the analysis of the current situation and the load and demand of electric power in Songyuan and Changling counties,the necessity for the construction of Changling three group 66 k V substation is pointed out,and the further research is carried out combined with the system plan.Through the calculation and analysis of circuit current and capacity,reactive power compensation and other related indicators,a reasonable arrangement and arrangement for the first and two designs of power system is made.Through comprehensive analysis and demonstration,evaluation of the meteorological conditions,natural environment and other factors,accurate selection of the completion of the Changling group of three 66 k V transformer substation,also defined the transmission path selection,put forward the detailed part of the engineering design of overhead line.Finally,this project has carried on the analysis of environmental protection,energy saving and emission reduction and labor safety measures to ensure the smooth implementation of the project.
Keywords/Search Tags:Power transmission and transformation project, Substation, Power system, Intelligentization
PDF Full Text Request
Related items