| Smart grid construction is based on the energy consumption and load distribution of regional distribution in our country,to adapt to the current and future social development of our country has taken power grid development approach,for all kinds of energy,especially for large scale wind power and solar power into and sends out the strong adaptability,can achieve a wide range of energy resources,efficient configuration.The construction of smart power grid in China has risen to the level of national strategy.Intelligent substation is one of the core platforms to realize energy conversion and control in the construction of strong smart grid.The continuous progress of modern science and technology,the rapid development of digital technology,and the increasing demand for electricity of the people,all promote the artificial substation towards automation,towards intelligence,towards the network,towards the civilian.With the rapid development of beipiao economy,the current power supply capacity of the power grid is obviously unable to meet the demand of local production and living electricity,so it is urgent to add new substations.Therefore,it is more and more urgent to expand the new 66 k V substation.In this context,this paper plans to complete the survey of the current situation of power supply load in Beipiao area,and start the design and construction of the 66 k V power transmission and transformation project of Beipiao Nanshan transformer station in accordance with the local situation.According to the a2-1 design scheme of the state grid,the primary part of the Beipiao Nanshan transformer power system,the secondary part of the power system,the site selection of the substation and the engineering construction part were designed,and an intelligent substation was constructed with new materials,equipment and technology.This paper makes a detailed survey of the power supply load in this area.The reserved substation construction land in the planning area is basically located in the load center,and the reserved land has all the conditions for substation construction.Therefore,as an important measure to meet the power supply demand and optimize the regional power grid,the 66 k V power transmission and transformation project of Beipiao Nanshan substation is theoretically completely achievable,which is of great significance for relieving the power pressure in Beipiao area and improving the power supply efficiency in this area. |