| Chiro town has got a structure plan in 2007.The prepared plan was intended to guide and fasten the economic development of the town for 10 years since 2017.However,the prepared structure plan has a multifaceted problem.There are complaints from various stakeholders that there is poor structure plan implementation in the town.As a result,the land resource of the town was extravagantly utilized and exposed for wastage by the technical staff,administrators and brokers.Furthermore,the plan was subjected to modification before its planning period.Hence,the above mentioned problems have prompted the researcher to make research on this topic.The general objective of this paper plan is to examine the major problems associated with the implementation of the chiro structure plan and to identify the factors affecting the proper implementation of the plan with particular emphasis to its technical aspects.Accordingly,to look into the issue deeply,the study used descriptive and exploratory research design and qualitative research approach.The finding of the study revealed that the structure plan was not properly implemented and lacked plan evaluation,monitoring.Hence,one can easily see irregular and irrational development as well as incompatible land uses in the town.The cause for the poor plan implementation was emanated from both the plan preparation and its implementation.Therefore,although the municipality has taken some measures to alleviate the poor plan implementation,it could not consider as enough action.Up on the findings the researcher has forwarded the following recommendations:preparing implementation guidelines,providing capacity building and performing periodic monitoring and evaluation,preparing action area plan,and implementation phase and etc. |