Font Size: a A A

Design And Implementation Of Power Project Integrated Management Platform Based On Data Center

Posted on:2023-01-04Degree:MasterType:Thesis
Country:ChinaCandidate:H ZhangFull Text:PDF
GTID:2532307070986729Subject:Project management
Abstract/Summary:PDF Full Text Request
At present,domestic power companies in major provincial capitals are actively carrying out data center construction,accumulating massive power project big data resources,and having the foundation for the research and application of big data in power projects.However,due to the large volume,wide types and many sources of power grid project data,it cannot be directly connected due to the limitations of system platform technology and professional barriers,and the fragmentation of the whole process of project data cannot provide effective and timely decision-making information for enterprises.Therefore,it is necessary to carry out research on the application of power project big data,improve the timeliness and consistency of power project data,and improve the efficiency of project management and enterprise management.Through literature research,interview method,questionnaire survey,case and functional analysis,rapid prototyping method and other methods,this thesis conducts research on the projects that need to be designed and implemented,mainly including the following contents:1.The research background,main problems,research ideas,research contents and research methods of the power project integrated management platform based on data centralization are analyzed,and related concepts and technologies of data centralization are introduced.2.Conducted demand analysis and prototype design for each functional module of the platform by means of demand research,and designed data tables and wide tables required by each module on the basis of traceability,governance and extraction of massive big data of power projects.3.Built a data sharing model and a data model for the whole process of the project,developed software on this basis,realized the fragmentation of the whole process of the project data and the early warning of abnormal situation of the project contract,and helped the owner to control the whole process of the project.4.Through multi-dimensional display of the whole process of the project,scientific,efficient and multi-level data display of the whole process of the project is realized,which improves the problem that a certain electrical power Research Institute cannot accurately and timely obtain the execution of the project contract.5.Summarizes the content and deficiencies of the research,and expounds the areas that need to be improved in the future.
Keywords/Search Tags:Power project, Big data, Data center, Project whole process management, Data sharing
PDF Full Text Request
Related items