Font Size: a A A

The Reform Design Of The Firefight Feedwater System In Ganzi Mountain Oil Depot In Fushun No.1 Petroleum Factory

Posted on:2006-03-28Degree:MasterType:Thesis
Country:ChinaCandidate:X M SunFull Text:PDF
GTID:2121360182476537Subject:Environmental Engineering
Abstract/Summary:PDF Full Text Request
According to the current technical standards of fire control , the paperdiscussed the disadvantages of the fire control supply system in Ganzi mountain oildepot in Fushun No.1 petroleum factory. A new design project for transformingthe fire control supply system had been put forword. The current systematic situation,background of the project, and feasibility for transforming had been analysed. Thenew technical process of transforming the fire control supply system was developedand calculated detailedly. The new technical project solved the systematicstandardized disadvantages of temporarily high-pressure fire control water supplysystem in Ganzi mountain oil depot in Fushun No.1 petroleum factory. Manyadvanced technologies were used in the new design project, such as computertechnology, PLC , frequency conversion to adjust speed of pumps, automatic watersupply of steady pressure pump of all automatically fire control. The high,low-voltage electricity of a reserve fire control pump and steady pressure pump comefrom the new high-pressure electric distribution station and the low-voltage electricdistributioan station of the central electric power substation in Ganzi mountain ,respectively . The standby pump and steady pressure pump were diesel pumps formeeting the demand of first class load power supply .A fire snag shoud be thoroughly resolved by using this design project in theGanzi mountain oil depot in Fushun No.1 Petroleum Factory, and also the whole safelevel of the factory will increase. It not only have the meaning of its theories, butalso have very big actual meaning.
Keywords/Search Tags:Oil depot, Firefight feedwater, Transform, Design
PDF Full Text Request
Related items