Research On The Milli-second Postpone Electricity Detonator Safety Production Process Reengineering And Evaluation For HongQi Chemical Engineering Company

Posted on:2009-11-22Degree:MasterType:Thesis
Country:ChinaCandidate:X M HaoFull Text:PDF
GTID:2121360272986971Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
The engineering detonator produce manufacturing to belong to public blow up device profession,Should profession because of it produce product of attribute decision production line more dangerous,is one of the six greatest Height dangerous professions. Because its production line existence be dangerous. Because its production line existence be dangerous, new technique usage get behind with other profession, the whole profession long-term be placed in production technique content,essence safety turn, produce the efficiency lowly condition. Milli- second postpone electricity detonator again call small margin electricity detonator, is a kind of holdover accuracy request higher, structure more complications, involve production unit more engineering detonator. Hongqi chemical engineering company milli- second postpone electricity detonator to build each unit respectively is build up in the last century 60's, 70's, 80's and 90's, because produce craft and equipments be widespread iner order to fall behind, much is 80's ago of equipments and craft, existence a great deal of of handicraft work and half mechanization work, each unit's being widespread existence labor efficiency be low, produce safety can not get guarantee of problem.This text is exactly according to under the above-mentioned background condition launch research, according to nation of relevant the law laws and profession" The 11 five years " programming outline request, pass rightness should the company milli- second to postpone electricity detonator to build belong to initiating explosives manufacturing unit, foundation detonator to build unit, electricity ignite a component manufacturing unit, postpone component manufacturing unit, milli- second postpone electricity detonator assemble unit etc. five part original safety and the work effect condition and case analysis find out existence safety level and the efficiency lowly node, in the meantime to each unit dangerous the harmful factor carry on analysis, then, usage industry engineering process reengineering(BPR) relevant the principle, theories, method carry on a process reengineering research and implement, usage safety control relevant theories, method to process reengineering empress each produce the unit carry on safety evaluation and safety problem confirm reach agreement definitely, and establishment accommodation of meet an emergency and prepare case, then and by the root change should the company milli- second postpone electricity detonator each produce unit safety level and produce the efficiency lowly situation.At full analysis research of foundation up, rightness each produce unit implement aim at sex of process reengineering, realization exaltation should product produce manufacturing of essence safety the double of the level and labor rate of production target.thesis research result as to other related business enterprise and other public blow up a device production line of reformation and safety condition evaluation all have importance of draw lessons from with expansion value.
Keywords/Search Tags:Hongqi chemical engineering compang, Milli-second delay electric detonator, Security production, Work efficiency, Process reengineering, Evaluati
PDF Full Text Request
Related items