Font Size: a A A

Planning And Study Of Capital International Airport Line Vehicle Base

Posted on:2006-01-26Degree:MasterType:Thesis
Country:ChinaCandidate:J H CaoFull Text:PDF
GTID:2132360182476209Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
traffic system are under planning to be built in over 140 airports all over the world. Inthe civil track traffic network planning in our country, most cities in China like,Hangzhou, Shenzhen, Qingdao, Chongqing, Chengdu are studying the track trafficsystem between cities and airports, and many airport highway are prepared toconstruct in Beijing, Shanghai, Guangzhou. In this article, initial agreements aretrying to be achieved on vehicle base landarea, investment scope, operationorganization structure etc, through studying the combining way of vehicle base andgarage in the track traffic system, application model of vehicle ways and relativeinvestment analysis of Capital Airport in Beijing, which is instructive to theconstruction practice in the future.In this article, the study on the direct line motor vehicle base in Capital Airport isdone in 4 parts. In the first part, introduction of track traffic of Capital Airport inBeijing;the second, current situation analysis of subway vehicle base layout and planboth in China and the other parts of the world;the third, through the study and theoryanalysis of subway vehicle base layout, the main technical principle and standards aredetermined;the fourth part covers the study of direct line motor vehicle base planningand design analysis. The scope and operation organization model is determinedthrough the study of vehicle moving direction analysis and garage combinationanalysis.Through study, on the basis of the characters of direct line motor vehicle,ensuring to meet the requirement of function and process, best use of land in bestlayout, the design is to place comprehensive maintain center, general inventory,training center in vehicle section to compose vehicle base with vehicle sectiontogether. Applying the design of " Concentrated testing and maintaining" model tomeet the requirement of length of general layout, to be reasonable layout, and best useof the land.
Keywords/Search Tags:Capital Airport Line, Direct line Motor System, Vehicle Base, Layout and Planning
PDF Full Text Request
Related items