The Research On Interrelation And Coordination Between Quality Control And Cost Control

Posted on:2007-05-21Degree:MasterType:Thesis
Country:ChinaCandidate:D L YuanFull Text:PDF
GTID:2132360185459339Subject:Structural engineering
Abstract/Summary:PDF Full Text Request
The three goals of project control are quality, time and cost. These three aspects condition each other and influence each other, so form a correlative antagonistic unity. Quality, time, and cost form the goal system of project management commonly. Changes on the one hand will inevitably arouse changes of the other two aspects. That is, if there are some wrong with one aspect, the whole system will out-of-balance, and so bring negative influence to project. Usually, in real project, people often clear one or two control goals, then, consider other factors. In view of this, this paper will discuss the coordinative relation of quality control and cost control on the premise of supposing that time can be guaranteed.In recent years, relevant researches on project management have gotten greater accomplishment, but researches which put the theoretical research of quality control with time control and cost control in the same important location are not so plenty. In this paper, writer just put the research of cost control and quality control together, in order to analyze the interaction relation of quality control and cost control as well as the coordinative relation of them. Via doing this, writer aims at offering reference suggestion for the future research in project management and producing some realistic guidance for the practical work in project management.On the ground of consulting relative documents, in this paper, writer utilizes the principle of cybernetics to expound the principle and methods of quality control and cost control in project management. Writer utilizes the correlative principle of compound system to analyze systematic coordination with quality control and cost control. further. In analyzing the coordinative relation between quality control and time control, writer leads into the concept "quality control and time control coordinate interface manage".
Keywords/Search Tags:Construction work, Quality control, Cost control, Coordinative relation
PDF Full Text Request
Related items