Study On Cost Controlling Of Interception Trunk Construction Project

Posted on:2009-06-11Degree:MasterType:Thesis
Country:ChinaCandidate:H L LiuFull Text:PDF
GTID:2132360245489643Subject:Project management
Abstract/Summary:PDF Full Text Request
Nowadays, China has large construction projects and a huge amount of investment, but the construction project cost control research and application is comparatively lagging behind. Along with the continuous deepening of economic reform and gradual improvement of construction market competition mechanism, construction and management of the production has undergone profound change. The construction project cost control of construction enterprises is the key to the competition in the market of the construction enterprises and it is also the core of Project Management. Therefore, this paper will have great realistic significance for LS interception trunk control of the cost of the project.The paper's main tasks are as follows:1. Introduce Project profile of LS interception trunk works builded by No. 13 HX Group companies, sum up the current construction project cost control in general, and propose objectives and contents of the cost control study.2. Discuss in detail the construction project cost management concepts, classification, process and construction cost control principles, contents and methods for the follow-up papers on a theoretical basis.3. Analyze the macroeconomic situation, the micro situation and the impact of cost factors which the LS interception of the stem projects are facing. With the analysis of construction cost of the environmental, it pointed out several major issues that the interception of the project cost control stem is facing.4. Discuss in detail LS interception trunk project cost control process. Firstly, strengthen the cost awareness, establish the effective cost control system. Then, according to the project reality, carry out construction plan optimization, and take the measures of Earned Value of the project to have the cost dynamic management during the construction process. And according to the project process, timely implement the project cost optimization progress, and actively collect information to claim the loss. Project firstly introduced the Project 2003 software-assisted control in order to accurately , really demonstrate the actual progress of the project, and make convenient, faster and cost analysis of the progress and correct an error promptly to ensure that the objectives of the project cost.5. Sum up and analyze the countermeasure of LS interception trunk project cost control, and point out the need to set up qualified, efficient project management, and properly handle the project manager of the responsibilities, rights, benefits. Try to use the Earned Value method to dynamically control, and to establish accounting operation mechanism and do a good job change work visa claims to ensure the effective control.Among the study to improve No. 13 of HX group companies control the level of the construction project cost is of practical value to other construction project cost control but also has a certain role of the reference.The research in this article will have the practical value to improve the HX group 13 company construction item cost control level. And it will also have certain reference function to other construction item cost control...
Keywords/Search Tags:construction projects, cost control, Earned Value Theory, Project 2003
PDF Full Text Request
Related items