Font Size: a A A

Research On Bid Decision And Management Of Power Project Construction

Posted on:2005-04-06Degree:MasterType:Thesis
Country:ChinaCandidate:H Q QiuFull Text:PDF
GTID:2156360122987516Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Project construction public bidding enter a bid make is an important reform of basic building management system. Though now, still have certain profession and region monopoly, but the power construction of our country is recruited enter a bid for now, just dynasty unify, open, compete by order direction development. It is to attend project construction to enter a bid that after power project market relieves completely, power construction enterprise undertakes the major channel of project project, enter a bid to quote, is to carry out project construction to enter a bid, core, it directly concerns power construction enterprise to enter a bid success or failure. This paper utilizes modern management theory especially modern recruit to enter a bid theoretical analysis and study that power project construction is recruited to enter a bid make policy aim at the present power project construction of our country with management to recruit enter a bid still make with quota present situation, this paper has discussed power project construction to carry out reform and the necessaryness of list system in counter-measure. According to every comment in public bidding, the weight that marks index is definite condition, this paper comes with AHP, determine to comment the weight that marks index again according to project characteristic.At the practising experience, on foundation, this paper has narrated power project construction to enter a bid strategy and skill, include information, collect and trail option, enter a bid to make policy internal and external department factor analysis, enter a bid the principle of the establishment of marked price and the selection of opportunity as well as power project enter a bid the method of tactful establishment. At the same time for now, the power company of different type enters a bid to quote have carried out discrepancy to melt, research and power project construction are recruited enter a bid, reform explore. When recruiting to enter a bid in skill, have summarized the unbalanced quotation law that adopts frequently, and make profit biggest disequilibrium quote with linear program model calculation. Then, have narrated power project to enter a bid, the risk management in quotation includes risk and assessment as well as the analysis of risk and the identification of risk factor to be on guard some kinds of method.In final, this paper utilizes model and the method of research in the certain power construction project of our country.
Keywords/Search Tags:Power project, Bid, Dicision, AHP, Linear programming
PDF Full Text Request
Related items