Font Size: a A A

The Research On The Project Management Mode Of The Thermo-Supply Net Reconstruction In FAW

Posted on:2005-04-30Degree:MasterType:Thesis
Country:ChinaCandidate:Z J LengFull Text:PDF
GTID:2156360152456767Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
Owner is the investor of construction project, the benefit and the use life is very important for the owner' profit. At the same time, in the course of business in construction market. Owners employ the undertakers to take on the project. That is : owners are client. So , owner is the primary factor on the manage of construction project and the engineering quality. In a word, the manage mode of one project is very important to the success of that project and whether the undertakers could gain benefit at last.Nowadays, one general project is operated according to the bargain. In other words, we call it the management mode based on contracts. But in our country the enterprise owners are always on the contrary. From the planning of construction project, requisition on land, and collecting fund, feasibility research, design, purchasing , operation, at last checking and production. All those courses above, they have to operate themselves. Even if , they practice the mode of construction supervision , but on account of the effect of planned economy ,the nonstandard code in domestic market and undertakers' management is low level. The owner company daren't to employ consultation companies to operate specialized and socialized measures on project management with full power. So, to attain the aim of "minor owner, powerful supervision." We still have to make great efforts .To improve the actual state, we must operate projects following actual international market rules. At present, there are few researches what are based on how to execute simple, applied and advanced mode of project manage as owner's chief mission.. Even there were, most of them are improved based on the undertakers, and a great number of owners' project manage are about the innovation on the manage system of construction project. How to constitute the system to inhibit the national enterprise's risk investment. Project balance and competition system. At present , it's imperative to carry out the researchs on how to make sure the project is operated effectively, to maximize the investors'benefit and minimize the investment risk is the chief aim; and how to execute the effective, advanced, anti-risk, high-benefit manner on project manage. This study bellow is based on the background. In this paper, we could get the research on how to choose the manage mode of construction project.I have analysised those chief theory characters and key points ,and concluded the amelioration period of native and abroad construction project management. Analysised comparatively the applicability among different manage mode . and what is more we have figured out that the specialization and socialization will be the compulsory trend in the future. In practice, according to the character in the project of FAW-thermo supply net . The principles to choose manage mode of construction are : project character , owner's demand ,project settings, market development level, undertakers' ability, project risk etc. And according to the practicability ,economics ,correspond, dynamic and anti-risk needs, we have designed the target evaluation principles. Then some specialists mark them as the manner which is called "delphy", At last we fix on the best one. At the same time, to make sure the project could operate effectively, I have fabricated the support system. The conclusion on the project of thermo-supply net is under supported and guided by Project Commercial. We will carry out the project managemnet system warranted by artificial person ,bid, construction supervision system, organize and operate the project with Fast-Track ,at the same time ,we must pay attention to the selection to contractors , cotract ,supervision, and project interface management .The mode I decide at last is the combination of theory and practical experience ,and the conclusion from using advanced international modes. The conclusion in the paper is to guide similar projects in our country, In addition, we create a manner of project manage which has changed from dualistic...
Keywords/Search Tags:owners, thermo-supply net reconstruction, engineering project, management mode, support system
PDF Full Text Request
Related items