Study On Control Of Investment For Nierji Water Complex Project

Posted on:2005-05-09Degree:MasterType:Thesis
Country:ChinaCandidate:Y LiFull Text:PDF
GTID:2156360152955749Subject:Hydraulic engineering
Abstract/Summary:PDF Full Text Request
Study on control of investment for water resource project is good for reducing the cost of project and increasing investment benefits. It is important problem that need to be resolved by juridical person of water project in our country. The thesis more detail study and discuss the controlling of investment for Nierji water complex project through analysis of engineering construction system and administration in our country, as well as actual condition in Nierji water complex project. Main points as follows:1. In advanced, the theses studied and analyzed administration system and investment system of water resources complex project construction in our country whole and deeply pointed out the main questions in investment control of water resources complex project construction and also introduced general condition of Nierji water complex project, so bring forward the purpose and contents of this thesis through detail analyzing problems in investment control of water resources complex project.2. Study and explore how to control the investment for Nierji water complex project in stages, analyze and demonstrate the scale of the project construction, confirm reasonable investments and construction scale of the project. Promote activity of design units, choice the plan of optimize design and avoid increase on design by virtue of concept of limitation of design fee.3. Take some actual cases in the engineering, analyzing the investment control in the bidding stage. For the purpose of control investment on the project, bring forward competition system, choose excellent construction team and decrease cost of project by bidding system.4. Make use of cost manage and principle of "static control, dynamic adjusting" in the implement, prepare budget of project administration and price difference calculation. Control static investment effectively considering factor of loan interest and price change. Make good supervise on dynamic by price difference adjusting according to factor change about investment. Strengthen contracts administration and plan scheme of capital use. Take good measure of quantity, price of project and pay for engineering. Deal with changing and claim of project properly, control investment by means of Nierji project construction administration system.5. Finally appraise the investment control effect on whole Nierji water complex project, summarize the results of study and put forwards some reasonable proposal.
Keywords/Search Tags:Nierji water complex, investment control, optimize design, bidding system, cost manage, contract administration
PDF Full Text Request
Related items