Font Size: a A A

Comprehensive Utilization Of1200t/d Gold Concentrate Recovery Project Cost Management Research

Posted on:2015-02-15Degree:MasterType:Thesis
Country:ChinaCandidate:Y Y YaoFull Text:PDF
GTID:2181330467466460Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
Reserves of gold resources is rich in our country, the gold exploration projects inrecent years, more and more, for the processing of gold resource consumptionincrease gradually, at present, gold mining, common problems is the serious pollution,recycling project cost is higher, the recovery rate of gold are inferior a series ofproblems, how to reasonable and effective, and the development of environmentalprotection recycling gold resources is the important technology. The gold pricecontinues to decline in recent years, the restriction of the various factors, the goldenterprises a lot of pressure, to seek greater development, in addition to the necessaryadvanced technology, rich capital, management play a more and more important rolein it. Gold enterprise project cost management mainly by reducing costs and increaseprofits, so as to improve enterprise management level, improve enterprise economicbenefits, enhance the gold enterprises core competitiveness. So the enterprise in theprocess of project construction, cost management as the core, to the cost benefit, is themost basic and the most effective way to realize the profit. Adopt modernmanagement methods and means to strengthen the cost management of the project,people-oriented, reduce consumption, increase efficiency, the pursuit of the besteconomic benefit, is the priority of engineering project cost management.This paper is mainly based on comprehensive utilization of shandong1200t/dgold concentrate recycling programmes for the specific case, the cost of themanagement research, in the process of research mainly divided into five parts, thefirst part is introduction, mainly on the research background, significance, researchstatus at home and abroad and so on questions to carry on the simple introduction;Secondly the paper elaborates the theoretical knowledge of research; After the1200t/d status quo of comprehensive utilization of gold concentrate recovery projects, theproblems existing in the cost control, concrete analysis summary reason; Andaccording to the solution of the above research conclusion, formulate correspondingmeasures, put forward the reasonable solution; The last part is summary, the paper summarized overview, find out the deficiency, and the paper points out the futuredevelopment. Hope that through the study of this paper can effectively reduce the costof comprehensive utilization of gold concentrate recycling project, enhance the profit.
Keywords/Search Tags:Comprehensive utilization of the recycling project, Project cost, Management
PDF Full Text Request
Related items