Font Size: a A A

Application Of Earn Value Method In Construction Project Cost Control Administration

Posted on:2011-06-14Degree:MasterType:Thesis
Country:ChinaCandidate:G H YaoFull Text:PDF
GTID:2189330332967825Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
Construction project cost control is an important aspect of project management, but also the basis for the management of the construction work. Increasingly competitive in the current market circumstances, the need for investment in construction project control and management work in-depth study so as to enhance their market competitiveness of the construction unit to promote sustainable development of enterprises.Project cost control is an important part of project control, project cost control will have a direct relationship to the project's success. Earned Value Management construction cost control law is one of the methods of the key technologies, its core idea is that through the introduction of a key intermediate variable - earned value, to help project managers analyze project costs, progress with the actual implementation of the plan the degree of deviation. In this paper, the main work done and conclusions are as follows:1. In the survey, based on the analysis of the status of construction project cost control, pointing out that the earned value management method in construction project cost control in the use of advantages.2. Introduced makes the value control law the elementary theory, the commonly used project construction cost control supervisor technology, as well as makes the value control law in the items of basic construction entire process construction cost controlled process application situation.3. Based on the earned value in south Qing administration garden afforestation landscape engineering cost management application research findings, use the earned value law can quite clearly region gives due to price changes caused by changes in the cost and the quantity change, earned value of project construction cost control administration report the information content of performance is larger, the dependence of project contracting earned value administration contract bidding documents and information content has greater dependence.
Keywords/Search Tags:Project Management, Project Control, Cost Control, Earned Value Management
PDF Full Text Request
Related items