EPC Mode General Contractor Risk Guard Mechanism Research

Posted on:2012-09-27Degree:MasterType:Thesis
Country:ChinaCandidate:X A FanFull Text:PDF
GTID:2189330335453163Subject:Structural engineering
Abstract/Summary:PDF Full Text Request
With China's accession to WTO, since the promotion of EPC, in the construction field, EPC pattern has been building owners in our favor. China's construction enterprises have also restructured. some large enterprises have the ability to have the EPC contract. Some major projects in the country have begun to try to use this mode, especially in the power petrochemical, metallurgical industries, however, housing construction, bridges, roads, municipal facilities and so is seldom used. Since the implementation of EPC process models exist in the project's many advantages, the implementation of construction projects EPC contract model is a general trend.In EPC projects, the general contractor has undertaken most of the risk, for the general contractor, how to strengthen risk management and reduce the risk of the project construction period to ensure the project is in accordance with the contract requirements of the general contractor to complete the important work of project management one. Therefore, this paper select the general contractor under the EPC mode as the study of risk prevention, the use of empirical estimation, survey, etc and access to a large number of risk management literature, the general contractor on the basis of risk identification, then use the gray clustering Methods risk evaluation index system, the general contractor of the quantitative risk assessment phase, obtained in the course of EPC projects at different stages in which the general contractor's level of risk. Then, combining all stages of the general contractor's level of risk, proposed risk response measures. Finally, supporting projects of Shanghai World Expo Chuan Yang River Bridge project as an example, this study used ideas and methods of river engineering contractors Chuan Yang risk analysis and evaluation, and proposed the project's risk prevention measures.In this paper, the research on the EPC project risk, the inventive, standing side the general contractor, to borrow mathematical model risk assessment system, the general contractor on the quantitative risk analysis and evaluation, combined with qualitative analysis, making the risk analysis is more objective, for the determination of the level of risk is more persuasive, which is another new risk management attempts.As the domestic use of EPC model works less, many of the EPC project risk researchers study the risks specific to the general contractor did not risk management, the article on the general contractor's risk identification, risk assessment is to draw foreign EPC Project risk management instruments and learn the risk management of projects carried out by the relevant methods. EPC contractor for the total project risk identification, risk assessment still needs to continue to accumulate a large number of project implementation and management experience in risk identification and quantitative evaluation of the follow-up still needs more research.
Keywords/Search Tags:EPC model, General Contracting, Risk Assessment, Risk prevention
PDF Full Text Request
Related items