Study On The Drilling Project Management Of Daywork Contract System Oriented HSE

Posted on:2007-04-08Degree:MasterType:Thesis
Country:ChinaCandidate:Y X ChengFull Text:PDF
GTID:2189360212468580Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
The oil-well drilling project is a vital link in the process of exploration and development of the petroleum and natural gas resources, which was a flexible production system with whole sets of advanced technology that consisted of several craft processes. The project has its characteristics of big production scale, large investment and high risks, especially spend large numbers of human resources, materials and money. With the deep progress of petroleum exploration and development, the geology status more complicated, the number of deep well, horizontal well, extended reach well and under-balanced well increasing continuously, it needs more and more the requirements of artesian well equipments and artesian well engineering technology, and larger investment than before. Therefore, oil-well drilling cost more money, whose proportion of total investment of exploration and development in petroleum and natural gas is increasing gradually.Aiming to the present situation of project management in the oil-well drilling engineering in China, the author made a study on the comparison the present domestic management system with the western advanced thought and method, analyzed the existed problems in the project management of oil-well drilling engineering, and introduced an international advanced daywork contract system and HSE system. Combining the reality of Xinjiang oil company, the paper proposed the HSE-oriented daywork project management system, which can control the cost, progress and risk of the artesian well project effectively.From the research of project management on the oil-well drilling, we can draw conclusions as follows:(1) Analyzed and compare the HSE and the daywork management system home and aboard. Also, the paper analyzed the application differences among the HSE management, the third party inspection system, the licensing system and the progress and cost controlling in the daywork system home and aboard.(2) By analyzing the present condition of organizational structure of the company and project, the project risk management, project cost and schedule control, the paper summarized the needs of system design and brought forward the whole thought which oriented HSE in the daywork project management system.(3) On the basis of analysis of the present condition of the project management,...
Keywords/Search Tags:HES, Daywork System, Project cost and Schedule control, Project risk management
PDF Full Text Request
Related items