Font Size: a A A

Studies On Problem And Countermeasure In Construction Of Forestry Ecological Project

Posted on:2008-08-16Degree:MasterType:Thesis
Country:ChinaCandidate:L Q BaiFull Text:PDF
GTID:2189360215994344Subject:Forestry
Abstract/Summary:PDF Full Text Request
The Central Committee of the Communist Party of China, State Council "decide about accelerating forest development's" has specifically worked out close and middle and future target for forest development in 2003, ascertain the forestry path of sustainable development giving first place to ecological conservation , build the territory organism's habits security system that principal part is forest tied grass in wedlock with forest cover.It is the main form to ascertain forestry project pushes forward for forest development at present and a period the days. How promptly and overall improve our country constructive quality and benefit of forestry ecological project, which is important to develop forestry quickly.On the basis that we have largely refered to constructive data about forestry ecological project at home and abroad, by induction combining with anatomy specific items, the text has analysed the excellent shortcoming and effect when our country actualized the forestry ecological conservation project, pointed out the problem of economic system , management system and office procedure in our country forestry ecological conservation in recent years.Specifically for these problems, combining with the author's practice participated in our country international forestry cooperative project during the past 10 years, the construction idea and countermeasure building method aspect's had brought forward, it is 9 idea about our country forestry ecological project, including follows: (1) forestry construction needs multiple target development; (2) forestry construction needs participant development; (3) forestry construction should introduce community; (4) forestry construction should regard weak crowd; (5) ecological construction should incarnate farmers ' benefit; (6)forestry construction must pay attention to biological diversity;(7)forestry construction must insist on entire process administration; (8)must set up the conception of quality first and managing good standing forest; (9)design science's forestation model and enlarge the proportion of mingled forest.as well as the construction of forestry ecological project need to adopt 10 kinds methods: (1)investigate meticulously and search problem and confirm development targets; (2)adopt project management by objectives; (3)carry out participation design; (4)set up the project design of executive plan and yearly plan; (5)carry out duty administration;(6)practise contract administration;(7)carry out quality control system and multi-level check up monitor system; (8)carry out account render system and financial audit system; (9)put into effect the entire proceeding administration; (10)adopt participation training method.finally, five indemnificatory steps were suggested according to our country current situation. (1)Our country leader should seriously make a point of doing in forestry ecological constructive project; (2)must set up perfect organization; (3)be going to have the necessary fund to ensure project; (4)desire to reinforce training to improve the diathesis of participation personnel; (5)strengthen technical sustentation, and so on.
Keywords/Search Tags:forestry, ecological project, construction, countermeasure, study
PDF Full Text Request
Related items