Font Size: a A A

Post-evaluation Of Weak-electricity Integration System Of The Chengdu Cigarette Factory Technological Transformations Project

Posted on:2007-03-30Degree:MasterType:Thesis
Country:ChinaCandidate:Y NiFull Text:PDF
GTID:2189360218462396Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Post project evaluation is one of the most import aspects of project management. Through post project evaluation, After the comprehensive summary project implementation experience lesson, discovers the existence the question and the reason, and through the prompt effective information feedback, adopts corrects an error to rectify the measure, regarding the realization item design goal, raises the project construction level, has the extremely important practical significance.During the "Tenth Five-Years Plan" period, is the Chinese tobacco profession production layout, the organizational structure, the product mix has the significant transformation crucial phase, also is improves the economical movement quality and the benefit important time. Since Chengdu Cigarette Factory the technological transformation project has been the enterprise had been established for 50 years the biggest technological transformations project. In view of the fact that the project unimportance, needs to post project evaluation carries on the experience to summarize, is the enterprise the "11th five-year plan" development plan provides the experience. The author embarks from own working practice, deeply felt the development of post project evaluation is importance, after thus chooses post-evaluation of weak electricity integration system in technological transformations project of chengdu cigarette factory takes the research topic.Firstly, this article will introduced background of the Chengdu Cigarette Factory technological transformation project and work content of weak electricity integration project construction. Elaborated the concept of post evaluation and the necessity of post evaluation work. After has summarized the organizations and agencies which the post evauation of project and the work process of post evaluation. Then aimed at the project technology, the management and the effect three aspects separately introduced the post evaluation of the weak electricity integration project and the method of the post evaluation. Finally summarizes refines the experience and the procedure which the post evaluation of project, analysis summary deficiency and puts forward the improvement proposal.
Keywords/Search Tags:Chengdu Cigarette Factory, Technological transformations, Weak electricity integration project, Post-evaluation of project
PDF Full Text Request
Related items