Research On Risk Management For Olympic Sailing Center Construction Projects Of Qingdao

Posted on:2009-05-04Degree:MasterType:Thesis
Country:ChinaCandidate:Y YueFull Text:PDF
GTID:2189360245488054Subject:Business management
Abstract/Summary:PDF Full Text Request
With the construction project scale expands day by day, the technical craft complexity enhances, each kind of risk also increases obviously. Specially the large-scale construction engineering project, relates to intriguingly, risk management has already become the key of academic and industrial areas. This research obtained from the project risk management theory, to analyze the risk and the building program risk concept and the characteristic, as well as project risk management content, procedure and goal. According to risk management's goal and the principle, on the basic of the science risk recognition and risk analysis's foundation, choose the risk counter measures reasonably, formulates the Olympic sailing center's main risk factor to deal with the plan, reduces or avoids the occurrence of the risk loses.By the research above mentioned, some results and conclusion have been obtained are as following.Take the Qingdao Olympic sailing center project as a core, through analyzes the concrete risk characteristic of Olympic sailing center engineering project, had the international project significance project to such one to carry on the classification of risk, arranged each kind of risk the possible factor, discussed in this project construction the risk management goal and the method. The definite risk which as well as each kind faces to the project indefinite, the latent risk carries on the recognition, the induction, the complex project risk will decompose into the simple risk factor, has established the concrete Olympic sailing center risk assessment indicator system.Analysis based on the level of risk evaluation method fuzzy comprehensive evaluation of the Olympic Sailing Center. AHP to use in calculating the risk of risk factors, risk grading, and then use fuzzy comprehensive evaluation of the project risk assessment to determine the total level of risk that the Olympic Sailing Centre project risks associated with the "middle" Conclusion. Identify the projects should focus on preventing risks, and a risk management plan, the proposed construction of the project risk management system and risk prevention measures.According to risk management's goal and the principle, the study takes the A kind of risk as risk management the key point, such as design risks, the construction cost uncertainty risk, the construction technique risk, material risks, equipment risk, natural hazards, market demand prospect and so on, and formulates the Olympic sailing center risk to deal with the plan, reduced and has avoided the occurrence which the risk lost. This research suggestion domestic project elements of consultation, the large-scale construction enterprise needs to do more foundational work in the risk recognition aspect, combing the daily engineering project implementation process establishment construction project risk detailed list or the risk handbook. Based on this strengthens to the project risk control, although in the short-term will increase the managed cost, but enhanced enterprise's core competency in the long run.
Keywords/Search Tags:Olympic Sailing Centre construction projects, risk management, AHP, fuzzy comprehensive evaluation
PDF Full Text Request
Related items