Studying Gongdong Chaozhou Power Plant 2~*1000MW Unit Project Management

Posted on:2009-09-24Degree:MasterType:Thesis
Country:ChinaCandidate:J Q LiuFull Text:PDF
GTID:2189360245975563Subject:Business Administration
Abstract/Summary:PDF Full Text Request
It is this paper core content that the host of the project how to manage and control.This paper first briefly analyse project management conditions of the host and the differences in domestic and abroad now .Then presented that the owners Should be in conjunction with the real situation in the country.The article focus on the three important points: project management, project control and project adjust .In this project control is the corner.In time control ,we should adopt adjustment measure according to actual progress.Then making and Carrying on new progress plan,the progress are controlled in under the project plan. Project quality control,we should hold the influence project quality the primary factor and establish quality control plan, main quality control point by according to designs the request.The project cost control should grasp the key aspect of the influence project cost,and put cost control into project entire process. This paper use the massive actual data of the engineering project of Guangdong Chaozhou power plant 2*1000MW uint project,and make a progress.This article summarize the experience and the harvest of the project management to the project owner.and take out the way to make a progress in this article.
Keywords/Search Tags:Project management, Progress control, Quality control, Cost control
PDF Full Text Request
Related items