Font Size: a A A

Delingshan 500kV Power Transformer Engineering Project Risk Analysis And Countermeasure

Posted on:2009-10-07Degree:MasterType:Thesis
Country:ChinaCandidate:Y E FanFull Text:PDF
GTID:2189360245975784Subject:Project management
Abstract/Summary:PDF Full Text Request
Along with electrical power system's rapid development, the electric power project's investment increases unceasingly, the engineering project has the risk factor and the risk under market economy's condition occurs possibly greatly increases, in the past the tradition (tender, signed contract, agreement and so on) the electric power project management method not to be able to meet the modern enterprise development need, the engineering project needs the standard, a more scientific method to manage, therefore the engineering project risk analysis and the countermeasure became the inevitable request. This article unifies the electric power market and the power transformer engineering project characteristic and the construction program, the use risk analysis theory and the method, unifies the German range mountain 500kv power transformer engineering project the investment implementation process, to the project earlier period phase of exploitation, the project construction period, management and operation time each stage, from the policy, the market, the management, the technical aspect has carried on the comprehensive careful risk analysis; And aims at this project various stages existence the risk, proposed concretely, the detailed risk management countermeasure, thus strengthened the German range mountain 500kv power transformer project risk management.
Keywords/Search Tags:power transformation, project, risk analysis, countermeasures
PDF Full Text Request
Related items