Font Size: a A A

Study Problem And Countermeasure On Project General Contract In Chain

Posted on:2009-12-05Degree:MasterType:Thesis
Country:ChinaCandidate:S L ChenFull Text:PDF
GTID:2189360272473792Subject:Construction Management and Real Estate
Abstract/Summary:PDF Full Text Request
The general contractor is a availability way for the project management, It used abroad in the world construction market, the construction management is changed systematism and advance by this method, it economized the capital and increase the profit for owner and the construction company . The project management is early in china ,but it is grow more slow especially near era, our level of the project management is distinctness trail to west country , illogicality in the organize frame, No deep and clear in the mode study of project management, No kilter , No criterion of the owner action and others.This paper start out form the history of the project management, to find the history the project management of the construction and the station of appliance and develop project management in our country. To be found the problem and shortage by form compare with abroad country. The author studied the problem and cause of formation form full and in-depth surface with the practice experience project management of more years. To point adoption the general contractor project management mode must be active form suit well general contractor scale, manage contractor mechanism, establish healthiness law& rule, criterion behavior of owner and improve the level of management and ability of competition and other countermeasure. It have use for reference this paper, and will be promote our country project management enter into international construction market by early .
Keywords/Search Tags:construction engineering, project general contract, project management, exist problem, countermeasure
PDF Full Text Request
Related items