Font Size: a A A

Study Of Quality Management Of The Projects Of YingZhou 220kV Transmission Line

Posted on:2010-03-27Degree:MasterType:Thesis
Country:ChinaCandidate:H Y ZhaoFull Text:PDF
GTID:2189360275484654Subject:Project management
Abstract/Summary:PDF Full Text Request
With the development of technology and society, architectural engineering has expanded in scale. The complexity and the information to be handled in the engineering management have been increased. To ensure the quality and speed of construction, quality control has to adapt with modern management and be accompanied with modern information technology.In order to control and manage the quality of project, first of all, the project should be split into the minimum working unit with the application of the technology of network. Therefore the general target of quality control should be split first to form the basic working unit, then the organization to the smallest organization unit. So each working unit can be done in the corresponding organization unit according to the principle of responsibility for quality and systematicness. The decomposition structures of work or organization can be chosen, divided, ordered and collected at any level.
Keywords/Search Tags:project management, quality control, target split
PDF Full Text Request
Related items