Font Size: a A A

The Financial Risk Management Of Shandong TaChi Class 500kV EHV Transformer New Energy-saving Projects

Posted on:2010-08-23Degree:MasterType:Thesis
Country:ChinaCandidate:W G HanFull Text:PDF
GTID:2189360275485725Subject:Project management
Abstract/Summary:PDF Full Text Request
Economic activities of high-risk enterprise the necessary to identify risks and understand the nature of the risk and also the risk of potential losses, on this situation to develop and implement the most effective risk management techniques is very important. Financial risk management is a relatively independent of the functions of management, it risks through the identification and control, the purpose is to achieve a minimum of cost to enable enterprises to minimize the risk of loss of purpose. The aim of this paper, the theory of financial risk management approach to financial risk management theory and Electric Co., Ltd. Shandong Tatsu Chi class 500kV EHV transformer new energy-saving projects by combining analysis of the project risk management process, as well as with the project related management tools, research enterprise's financial risk management theory in the actual operation of the application; and, in accordance with international practice a series of financial risk management theory, the development of the project to assess financial risk management so as to promote the development of the theory, and The implementation of the project to provide some specific recommendations.China's power industry is in a sustained and rapid development period, an inevitable requirement for the great development of power compatible with the key power transmission equipment - large-scale power transformer is also necessary to develop at the same pace. Tatsu Chi Shandong Electric Transformer Co., Ltd. is a domestic production industry-led enterprises, over the years for the country's power to make a greater contribution to the building. Enterprises based on the existing building through technology, further development and production of 500kV power transformer level to improve the technological level and grade of products to improve the ultra-high voltage, large capacity of the transformer equipment, complete sets of the ability to further expand exports, and to achieve reasonable, the best economies of scale to meet the new situation of power development, in line with the direction of industry product development and national industrial policies.This paper introduces the enterprise's financial risk management theory and methods in general, in the course of the study used a qualitative analysis and quantitative analysis method of combining of 500kV EHV-class new energy-saving projects in the basic situation of the transformer, the market environment, the project financial position an analysis, based on this project to identify the existence of financial risk and put forward the targeted prevention and control measures. The research projects will be up to Chi-class energy-saving electrical appliances 500kV power transformer project's financial risk management play an important direct role in the implementation of the project to improve and promote the development of electrical Tatsu relaxation strategies, efficient energy saving and environmental protection into the new S11 transformer energy-saving plays an important role, not only help to improve the efficiency of business investment, to circumvent the financial risk, but also for such projects to provide financial risk management can draw on the research paradigm.
Keywords/Search Tags:New energy-saving, Financial Risk, Manage
PDF Full Text Request
Related items