Construction Agent System For Government-funded Projects Risk Control And Evaluation Index System For The Applied Research

Posted on:2010-06-17Degree:MasterType:Thesis
Country:ChinaCandidate:T X NanFull Text:PDF
GTID:2189360275486259Subject:Project management
Abstract/Summary:PDF Full Text Request
For a long time, our country's government investment projects are invested by the government funds with government investment as the main part. They are arranged, designed and constructed by the administrative department with the measure of the highly centralized quaternity management mode which is"investment, construction, management and use"From 1980s, a lot of local government branches have been questing and putting the buying pattern of the non-operational government investment projects in practice in many different ways. Some local government branches began trying to entrust and make experiments of some non-operational government investment projects.The government investment projects have the characteristics of large scale construction, diversified investment, long construction period, many uncertainties and far-reaching social impact. So the government investment projects should have stricter management procedure and measures than the common projects do. The main part of the projects will easily fail if they cant fully understand or effectively control the risk factor in the projects. With the introduction of construction agent system's management mode of the government investment projects, to standardize and solve the risk of construction agent system of the government investment projects will be a crucial question in achieving the purpose of the government investment projects and embodying the advantage of construction agent system projects'management mode.The present paper in analyzes domestic and foreign to the generation of organic project risk investigation foundation, has carried on the analysis to a generation of organic elementary theory, and has given the government investment items of basic construction choice generation of organic theory basis. Then elaborated the government investment project generation of organic risk origin, and from gradualness, the systematic characteristic, the goal and so on many angles carries on the forecast to the risk factor. Proposed according to the forecast result under government investment project generation of organization system risk control and measure, the generation of organization system synthesis evaluation of tenders system is the risk source control important measure. Through the establishment perfect generation of organization system comprehensive evaluation of tenders system, argues vigorously a government investment project generation of organic risk falls lowly. The full text is divided six chapters, the first chapter of introduction, mainly briefs the domestic and foreign research present situation and the paper your research content and the method; The second chapter the generation of organic theoretical analysis, mainly introduced a generation of organic related concept and the government investment project choice generation of organic theory basis; The third chapter the generation of organic risk's guard and the control, mainly introduced that the risk the origin and the analysis, and propose the counter measures; The fourth chapter the generation of organization system synthesis evaluation of tenders system's construction, this system takes the guard risk the important measure, argues vigorously reduces through this evaluation of tenders system from the project construction the risk; The fifth chapter the empirical analysis, carries on the examination using the Qingzhou two center construction's evaluation of tenders to the generation of organization system synthesis evaluation of tenders system; The sixth chapter conclusion and forecast.
Keywords/Search Tags:government investment projects, construction agent system, risk control, evaluation indicators
PDF Full Text Request
Related items