This article according as the characteristic of the type of dam of Songjianghe hydrolic key project Xiaoshan power station to design the dam outside deformation and analyses the monitor materials. It brings up the vertical displacement observation during construction. And proved it is feasibility and obtained excellent efficiency . This article also proved the feasibility of the outside automatic monitor system of Xiaoshan dam. |