Colored Dressing Construction Projects, Equipment Pre-management Research And Practice

Posted on:2006-10-13Degree:MasterType:Thesis
Country:ChinaCandidate:Q H DaiFull Text:PDF
GTID:2206360155465168Subject:Mechanical engineering
Abstract/Summary:PDF Full Text Request
In the building project of selecting mine, if there were not enough studying about the pre-management of equipments, it would make a great loss that cannot be reparative. Proposed Terotechnology was one of important achievements in modern equipments management. Terotechnology push the theory of equipments management to a new high developing peak. The fundamental start point is that equipments management should take the life cycle of equipment as a management object and, through the methods of technological, economic, management, and so on, pursue a lowest expenditure in the life cycle of equipment. The thesis analyzed the characteristics of the building project of selecting mine. And it applied the fundamental theory of terotechnology to research the work methods and operational flows of pre-management in the building project of selecting mine. The main purpose is to reduce the possibility of wrong decision-making because there is scarcity of the necessary decision-making information during the period of the building project of selecting mine. After finishing the building project, that can proposes advantage conditions for the systemic, safe andeconomic operation of production, and make the production be able to run in smoothly.
Keywords/Search Tags:the building project of selecting mine, the pre-management of equipments, terotechnology, the life cycle of equipment, expenditure, decision-making
PDF Full Text Request
Related items