Scheduling Control On Automatic Transformation Project In Wali Substation

Posted on:2012-05-16Degree:MasterType:Thesis
Country:ChinaCandidate:X Y LiuFull Text:PDF
GTID:2212330338969069Subject:Project management
Abstract/Summary:PDF Full Text Request
Project management in China is a relatively mature theoretical system, it is a system management process some of the tools and skills, methods, and other application areas such as the results of the combination, with optimal allocation of resources, reduce costs, increase profits, improve efficiency of the important effect. In construction cost, quality, schedule control of the three objectives of project management, schedule control is the most important content. It effectively control the progress of the implementation of the project and ensure its smooth to achieve the desired goal, which is a central task of project management.In this paper, the progress of the project control theory and the characteristics of substation reconstruction project, the transformation of substation automation Wali study, the specific schedule for implementation of the project control process to analyze some problems in the problem, the progress of construction from the theory of control and technology application to Wali substation automation of the progress of reconstruction projects and other aspects of the implementation of control plans and a detailed analysis, and proposed project schedule that exist in the operation of the project specific issues, and finally address these issues, we proposed corresponding measures.
Keywords/Search Tags:transformer substation automation project, controlling, CPM
PDF Full Text Request
Related items