Font Size: a A A

Research On Transformer Substation Synthesis Automation Innovation Project Process Management

Posted on:2012-12-25Degree:MasterType:Thesis
Country:ChinaCandidate:L H HuangFull Text:PDF
GTID:2132330332494706Subject:Project management
Abstract/Summary:PDF Full Text Request
In the last few years, the domestic a series of macroeconomic regulation and control policy's stimulation, the domestic economy fast development, the electric power consumer demand grows speeds up obviously, the electric power supply and demand situation tends to be intense, the electric power infrastructure enters the high speed development time. The power transformer items of basic construction itself have the fund technology crowded, to select broadly, the construction cycle long and so on characteristics, objectively requests the electric power infrastructure to from embark long-term, the science plan, the reasonable design, integration construction management, strengthens the project process management, fulfiling exactly incurs the tender, guarantees the transformer substation synthesis automation innovation project the progress, the cost, the quality and the security.This article take the transformer substation synthesis automation innovation project as the object of study, take the project management theory as the foundation, first elaborated the electric power project management duty, the characteristic and the management; Then has analyzed the transformer substation synthesis automation innovation project management characteristic, the management content and the method, the universal existence question and carries on the project process management the necessity; And elaborated how to establish the transformer substation synthesis automation innovation project management by objectives system, the design suits the transformer substation synthesis automation innovation project the organizational structure and how to determine the post and the function. And through the synthesis automation innovation project example, from the transformer substation synthesis automation innovation project schedule management's content, the progress plan, the influence progress's factor, the guarantee progress's measure, project quality management content and the influencing factor and the regulatory measures, project cost management content and the regulatory measures, the project safety control's content and the management measure, the project organization coordinated management as well as the information management and so on has carried on the detailed elaboration. In the synthesis automation improvement project, through the project management method's application, the progress was under the control, the quality to obtain the guarantee, the cost to obtain saved, obtained the safeguard safely, the project management pattern also in the unceasing renewal.
Keywords/Search Tags:Transformer substation transformation, project management, process management
PDF Full Text Request
Related items