Font Size: a A A

Resources Committee And Wartime Power Industry Construction,

Posted on:2012-07-22Degree:MasterType:Thesis
Country:ChinaCandidate:B F SuFull Text:PDF
GTID:2215330338474927Subject:China's modern history
Abstract/Summary:PDF Full Text Request
In the period of the Anti-Japanese War, the National Resources Commission subordinated to Ministry of Economic Affairs of the National Government undertook the responsibility of heavy industry construction, management and operation. It took charge of basic industry, important mining industry, power utility and so on. After the outbreak of the Anti-Japanese War, a large number of factories moved form coastal area into inland, and at the same time, the demand for power increased rapidly. Therefore, the National Resource Commission took the electric power industry as the major task to develop. During the difficult wartime, the electric power industry sponsored and managed in the rear area by the National Resources Commission, not only met the power demand of the rear military and civilian, but also laid foundation for the postwar industrialization of China.This article tried to analyze the development of the National Resources Commission and electric power industry on the basis of the massive reference materials and some other historical records, and then made an objective assessment of the role which played in the Anti-Japanese War. The article was mainly composed of following parts:The introductory part mainly explains the origin of this selected subject and reviews related academic research home and abroad. The first part of the text elaborates the background of the National Resources Commission's electric power industry construction. It shows a fact that after the outbreak of the Anti-Japanese War, the massive factories moved to the inland and the inland industry developed very fast. So the supply of the electric power in inland was very tight. This had provided broad space for the development of the National Resources Commission's electric power industry. Secondly, the article elaborates the construction policy and plan of its electric power industry in the wartime. It also discusses the construction practice of the National Resources Commission's electric power industry from multi-dimension and multi-angle, to get a conclusion about its construction characteristics. Thirdly, the article mainly discussed the specific way and form of the National Resources Commission's electric power industry construction, through the case analysis of Kunhu electric power plant and Xijing electric power plant. Finally, the article gives fair and objective judge on the function which the National Resources Commission played in the electric power industry construction during the Anti-Japanese War time.
Keywords/Search Tags:Anti-Japanese War period, the National Resources Commission, the electric power industry construction
PDF Full Text Request
Related items