Management Of Construction Progress Of HG Building

Posted on:2012-03-18Degree:MasterType:Thesis
Country:ChinaCandidate:D Q WangFull Text:PDF
GTID:2219330338464694Subject:Project management
Abstract/Summary:PDF Full Text Request
Project management is to affect our lives in various ways, construction projects, software projects, organizational change projects, etc. Project management theory plays a great role to make project management more mature. Schedule management is an important part of the management of one project to make that the project in a reasonable period is of high-quality work done.Construction schedule management is the core content of the management of construction projects. Can the project within the time stipulated in the contract delivery is directly related to the project of economic and social benefits of play. Schedule control and cost control objectives, quality control goal is the unity of opposites, in general, slow progress is necessary to increase the cost, time to vote in advance will also increase economic efficiency; progress fast could affect the quality, strict quality control in turn, may affect the progress of; but if strict quality control to avoid rework, will accelerate progress. Progress, quality and cost three goals is a unity of opposites, and the construction phase is the formative stages of project entity, its the whole project schedule control is the focus of the progress of construction control. Progress of the project management is to resolve the contradiction between the three, it is necessary to progress faster, but also cost less, good quality. Therefore, a reasonable arrangement, it is necessary to control the construction schedule.Paper as the background in an integrated space project to study the progress of the construction project management. First, the article describes the research situation at home and abroad, and then schedule management overview of the theory, then this space on the HG comprehensive overview of the project, describes the general construction scheme. On this basis, we use information theory and construction programs, to study the progress of the integrated management of space projects in the HG of specific applications. Construction schedule management simply in two steps, first step is the development schedule, the second step is to schedule control. In this paper, schedule-making method using a bar chart and network diagram method developed two methods to schedule bar chart method has the advantage of intuitive, network diagrams using rules to the logic of construction activities expressed.Progress control, the paper first comprehensive space HG schedule control the content, processes and procedures described. Progress control of the content into the overall schedule control and detailed progress control, schedule control and then explained the process and, finally, progress control step, HG step of the progress of integrated space is first check the schedule, the second is to determine actual progress has deviated from the schedule, the final decision whether to adjust the schedule.In this paper, the progress of control programs for HG integrated space, put forward some practical suggestions, including the duration of the assurance measures. As a longer duration, which developed during the rainy season in winter and construction measures. Security is to ensure the progress of the first element, also proposed practical measures to ensure safety.
Keywords/Search Tags:project management, schedule management, schedule control
PDF Full Text Request
Related items