Font Size: a A A

Study On Influencing Factors Of Market-oriented Construction Agent Mode Selection

Posted on:2012-04-01Degree:MasterType:Thesis
Country:ChinaCandidate:Y W FuFull Text:PDF
GTID:2219330368988257Subject:Project management
Abstract/Summary:PDF Full Text Request
With the deepening reform of China's investment, government investment projects shift gradually to "investment, construction, management, use". Government investment projects taking agent construction system can reduce the burden on government. It also improves government investment efficiency and project management professional level. This area quickly attracted the widespread attention of local scholars and practitioners. But in pilot zone, there have been many unintended problems. For example, new agent institutions led to high operating costs, but efficiency is not high. Government found that there is no qualified agent institution in market. The reason of problem are the local conditions, project status doesn't match the agent construction model. Resulting pattern does not match with the actual situation. Not only did not ultimately save money, time cost, but instead counter-productive. Therefore, we identify the factors of affecting the construction mode selection, analysis of the impact of factors on agent construction system. This is important to protect China's government investment projects critical to the successful implementation of agent cnstruction system. Through stepwise multi-regression by the result from a survey, it proved that the relationship between influencing factors and market-oriented construction agent mode selection is significant, and analyzed the diverse influence on market-oriented construction agent mode selection by influencing factors.On the basis of the current literature which is associated with market-oriented construction agent mode and experts interview in government departments and agents in pilot areas in China, this thesis summarizes the influencing factors of market-oriented construction agent mode. And then it generated four dimensions through the factor analysis for pre-test data with empirical research methods. The dimensions are external environment, stakeholders, project characteristics and requirements and the implementation process of construction agent. And then this thesis built the research model of market-oriented construction agent mode selection and put forward hypothesis and developed the measurement scale and finally complete the hypothesis test. Empirical results show that the external environment is the most important aspects. The integrity of policies and regulations in the external environment factors is the most significant. In addition, the wish of government principal leaders is the most significant for market-oriented construction agent mode selection among the stakeholders factors. The standard of project management fees is the factor which should focus on mostly among the factors of project characteristics and requirements. And the potential binding of construction agent is the most important influencing factor in the factors of the implementation process of construction agent.
Keywords/Search Tags:Agent construction system, market-oriented agent construction, government centralized agent construction, mode selection, influence factors
PDF Full Text Request
Related items