Research Of Schedule Planning Design And Control Based On The Critical Chain Technique In Oilifeld Ground Engineering Project

Posted on:2014-02-14Degree:MasterType:Thesis
Country:ChinaCandidate:Z B MaFull Text:PDF
GTID:2231330398996006Subject:Petroleum engineering management
Abstract/Summary:PDF Full Text Request
At present, the progress of the traditional project management methods in the practical application ofmany of the shortcomings, such as determining the critical path does not consider the problem of resourceconstraints, the estimated duration is too long, no effective measures to deal with random events. So, theprogress of the critical chain management methods have been proposed. It uses three estimation methods todetermine the duration of time, consider the problem of resource constraints, key chain so determined is morein line with the actual construction.Critical chain technology widely used in other industrial areas, but very little in oil ground engineering,can learn from the experience much for oilfield surface construction projects, complex structure, large projects,long duration of time, the technical quality demanding process a wide range of relevant departments andinfluencing factors of uncertainty and other characteristics, research and the use of critical chain projectprogress oilfield surface engineering control will be more help to improve the efficiency of resource use in theoilfield construction process help to solve the problem of the progress of work, to help energy companiescompleted on time, minimize or does not appear to delays caused by the increased cost burden. In this paper, byanalyzing the shortcomings of traditional project schedule management method, combined with the backgroundof the critical chain, summed up the implicit assumptions of the superiority of the critical chain and criticalchain management theory, a detailed analysis of oilfield surface characteristics of the project management thekey factors of the elements and affect the progress of the project, estimated from the time of project processes,determination of the size of the buffer, the buffer management mechanism oilfield ground engineering projectschedule model ideas, last, Liaohe Oilfield, a joint station project the identification of project critical chainbuffer settings, draw under the critical chain schedule. Control so schedule chart the progress of the project, keychain on the basis of the original schedule and rational design of the buffer, and to determine a reasonablelength of the buffer, and then to ensure that the project schedule requirements under the conditions of thesmooth implementation of adds further protection. Based on this, the relatively comprehensive considerationproject resource constraints, project complexity and managers risk appetite conditions, oilfield surfaceengineering project schedule-controlled buffer zone set new method is feasible and necessity.
Keywords/Search Tags:critical chain, oilfield surface engineering, schedule, buffer
PDF Full Text Request
Related items