Font Size: a A A

Design And Selection Of The Railway Out-of Gauge And Overweight Cargo Loading Program

Posted on:2013-12-25Degree:MasterType:Thesis
Country:ChinaCandidate:P JiangFull Text:PDF
GTID:2232330371478557Subject:Logistics Engineering
Abstract/Summary:PDF Full Text Request
In pace with the development of our national economy and rapid progress of science and technology, the rail transport has accelerate the pace of construction. Foreign out-of gauge and overweight cargo transportation practice shows that rail is the ideal out-of gauge and overweight cargo transportation, but rail out-of gauge and overweight cargo loading work is the most difficult work among the rail transport production process, and is also regarded as the focus work of railway logistics freight sector at all levels. At the same time, brings the railway transport work more challenges and requirements. Out-of gauge and overweight cargo transportation as an integral part in the railway transport of goods, has a profound significance in the development of national economy, especially the national infrastructure. These goods have long, high, overweight and other shape characteristics cause the load difficult, and also because the out-of gauge and overweight cargo is with special characteristics so require load programs and run organization program is quite different from other general cargo. However, China’s railway out-of gauge and overweight cargo regulatory system is not perfect, does not have a specific out-of gauge and overweight cargo loading mechanism, in the face of many new tasks and new challenges, how to improve the loading of the goods is very important, so in this paper the study and exploration has a very important value and practical significance, provide an effective reference implementation of out-of gauge and overweight cargo loading program information and for the railway sector.This article from the theories of the out-of gauge and overweight cargo and rail freight organizations, combined with the actual background, analysis of the relevant characteristics of the out-of gauge and overweight cargo loading, gives the mathematical model and solution procedure of the out-of gauge and overweight cargo loading intelligent decision in order to solve the problem of low efficiency in traditional manually loaded the program decision-making. The article pointed out that the loading program evaluation is an extremely important basic work, Analysis the factors which influence the evaluation of out-of gauge and overweight cargo loading program, build the evaluation index system of out-of gauge and overweight cargo loading program,and according to the characteristic of the evaluation index system to determine the usage of fuzzy comprehensive evaluation method, select security, an indicator of the economy and convenience as the pros and cons of the evaluation program to be evaluated. Finally, use the instance to analyze the out-of gauge and overweight cargo loading program selection and selection process.
Keywords/Search Tags:Railway transportation, Out-of gauge and overweight cargo, Loaddecision-making, Fuzzy comprehensive evaluation
PDF Full Text Request
Related items