Font Size: a A A

Research On Fire Protection Engineering Project Schedule Management Of Jiuhua Villa

Posted on:2014-02-16Degree:MasterType:Thesis
Country:ChinaCandidate:Q ZhangFull Text:PDF
GTID:2232330395994658Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
Fire engineering construction design in recent years is an indispensable part ofthe20th century, scientists have gradually formed a large number of studies thephenomenon of fire and the invention of the prevention and control of fire apparatusand related technologies knowledge system, fire works as a comprehensive course,includes not only the physical, chemical, fuel, fluid mechanics, mathematics,machinery and electronics, architecture and other disciplines, but also law,economics, management, science and other disasters. Jiuhua villa is located in thetown of Changping District, Beijing, was opened from the Yuan dynasty imperialgarden is the ancient feudal emperors proprietary enjoy, covers an area of2,000acres, with more than2300different styles of rooms; ten I different style restaurants;perfect convention and exhibition facilities. Such a large entertainment Jiuhua villa,fire safety is a top priority of the building. Jiuhua villa Fire Engineering mainlyrefers to the progress and quality control of the design and planning of fire protectionsystems, fire systems engineering building and construction, fire engineering.Jiuhua villa is one of the large building facilities is public places ofentertainment, hotels, restaurants, shopping malls, so the fire danger is that:combustible load, hotels and restaurants generally store a large amount ofcombustible household items and office supplies, when the fire broke out, thecombustion of these materials release toxic gas, is not easy to evacuation and firefighting; privacy in the room is relatively strong, the fire occurred at the beginning ofthe stage is not easy to do discovery and control; staff mobility, present in China, most of the accommodation of customers will not be too much to care about thelocation of emergency exits and evacuation routes in the the mostly current situation,in the event of fire can not be found safety exits and evacuation, likely to cause thegroup of death group injury; fire consumes huge quantities, whether it is a meal,entertainment or overnight guests smoking phenomenon more difficult to control, inaddition to the boiler room, power distribution room area is also prone to thelocation of the fire; fire fighting and evacuation difficult, usually hotels for high-risebuildings, after a fire, the fire quickly spread, fire fighting difficult, personnel Sudifficulties. Therefore, the structure is so complex crowded places, fire safety isparticularly important, in the event of fire very easily lead to major fire manycasualties accident. Therefore, fire engineering construction has become the toppriority of the project, various fire set automatic operation, the linkage state becomethe focus of the day-to-day use. Therefore, the construction process must be strictlyin accordance with the relevant fire regulations and the national technicalspecifications, to ensure that play the biggest role in the late stage.By Jiuhua villa Fire Engineering in all aspects of the construction of thebuilding, combined with aspects of project management, automatic fire alarmsystems linked; sprinkler system; ventilation smoke control system; gas fireextinguishing system; fire leakage alarm system; all processes of fire doors and firevolume curtain gate and other reasonable arrangements, prepared by the projectschedule, Gantt diagrams and other reasonable optimize the implementation steps ofthe project, the correct choice of project progress, the more complicated multi-stepconstruction work as scheduled. For the duration of the control to ensure the projectcan be completed on schedule. On the other hand, due to the design and constructionin accordance with the relevant norms, the greatest degree of assurance the fire auditinspection requirements, to ensure that the latter part of the examination andacceptance of work to pass, to avoid duplicate construction. Secondly, for the people and the construction process control, as much as possible to reduce unnecessaryconstruction costs, and regulate the order of the construction site safety, in order toachieve the requirements of the safe, civilized, green site.Finally, the introduction of project management to the fire protectionengineering, fire team building to achieve better development, which is conducive tofuture corresponding to different types of fire or other disaster rescue and command,but also makes the construction work in the fire protection engineering rationalizedevelopment, optimizing the design and management of building fire protectionengineering, building fire more standardized, more efficient, in the case of ensuringthe construction costs to meet the demand of the people to a safe living environment.
Keywords/Search Tags:Project Management, Fire Protection Engineering, Project Plan, Project Control
PDF Full Text Request
Related items