| The engineering project post evaluation is an analysis on the purpose, theimplementation process, the benefits and impacts of the project after the completion of theproject. Determine the decision and judgment of the project and the achievement of the maineconomic index, through summary and analysis every aspect of the engineering projectinvestment decision-making, and the construction of the implementation process, through theanalysis of differences on the project to summing up the experience and lessons. Improve theproject decision-making and management level to provide a reliable reference, in order toimprove the overall efficiency of the project.This paper based on the general theory and method of the engineering project postevaluation, based on the practical investigation and analysis, combine the project of DaQinghighway passenger terminal. Using the analytic hierarchy process and other methods ofanalysis, construct the comprehensive index system of the engineering project post evaluation,and make a comprehensive evaluation of the project of DaQing highway passenger terminal.According to the result of the project evaluation, put forward the research conclusions, andthere is a reference for future research on government investment project post evaluation. |